At wind turbine tower installation sites, the chain hoisting system utilizes a multi-link chain assembly (4-8 links) to achieve load distribution. Equipped with an anti-rotation hook and a load indicator, it can stably lift 100-ton towers in wind speeds up to level 12. Its elastic deformation is controlled within 0.5%, ensuring precise alignment and installation accuracy.